Working closely with the client on this project, FDC were contracted by the main contractor to install and fit this difficult curved steel frame across two floors of the project.

This project had it’s difficulties due to the nature of the double curved front aspect of the balcony area.

‚ÄčWe installed it in some of the worst weather conditions we have faced to date, the second floor steels in the curved roof were difficult to fit on some of the elevations. Once up, they looked great and the client is in the final stages of the build now.

We look forward to seeing the finished results and the stunning view over the Downs.